A Goal-Programming Based, Expert Worker Scheduling System For Underground Coal Mines

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 14
- File Size:
- 585 KB
- Publication Date:
- Jan 1, 1991
Abstract
A goal programming-based worker scheduling model has been incorporated in the Mine Management Support System (MMSS) for assigning workers to prioritized jobs on a shift basis. In the model the accomplishment of each regular and non-regular job is a goal. The objective is minimization of the deviations away from the goals. A number of coefficients are used as premultipliers of the decision variables in order to address practical considerations associated with the utilization of workers and the requirements of jobs. Some of these premultipliers will be updated expertly within MMSS, timely updating the statuses of the dynamic parameters.
Citation
APA:
(1991) A Goal-Programming Based, Expert Worker Scheduling System For Underground Coal MinesMLA: A Goal-Programming Based, Expert Worker Scheduling System For Underground Coal Mines. Society for Mining, Metallurgy & Exploration, 1991.