A Dynamic Model of the Stage II Tailings Leach Plant at Chingola

The Australasian Institute of Mining and Metallurgy
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
12
File Size:
324 KB
Publication Date:
Jan 1, 1977

Abstract

The Tailings Leach Plant at Chingola employs a Leach/Solvent Extraction/Electro- winning process and contains the largest solvent extraction plant in the world, with design liquor flow rates of 55 m3/min. A pilot plant constructed to provide design data also indi- cated areas of uncertain operating and control performance and led to a decision to model the whole circuit to determine the overall dynamic behaviour and basic operating characteristics. Details of the plant flowsheet are given and the basic physical and chemical' equations required for the simulation defined. Each unit operation is considered separately and details of the mathematical models used for their simulation presented.
Citation

APA:  (1977)  A Dynamic Model of the Stage II Tailings Leach Plant at Chingola

MLA: A Dynamic Model of the Stage II Tailings Leach Plant at Chingola. The Australasian Institute of Mining and Metallurgy, 1977.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account