A case study of technical, social and environmental challenges for a gold project development in Western Turkey

- Organization:
- The Australasian Institute of Mining and Metallurgy
- Pages:
- 2
- File Size:
- 298 KB
- Publication Date:
- Nov 21, 2018
Abstract
Most developing projects face a range of technical and non-technical challenges, and examination of development histories can potentially provide insights into improved approaches to project development. The Kestanelik project in the Canakkale region of Western Turkey was acquired by Chesser Resources Ltd in 2008. Turkey is a significant and growing source of gold production, with sector participation by both domestic and international companies. While the broad ranges of challenges faced by developing projects is well known, there are relatively few case studies in which the range of technical, environmental, social and governance challenges are presented in a single contribution. Recent studies of undeveloped complex orebodies have particularly shown the extent to which environment, social and governance (ESG) complexities contribute to project delays and failures. The Kestanelik project faced a full range of technical and ESG complexities, and provides an illustrative example of the associated challenges. CITATION: Valenta, R, 2018. A case study of technical, social and environmental challenges for a gold project development in Western Turkey, in Proceedings Complex Orebodies Conference 2018, pp 73–74 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Citation
APA:
(2018) A case study of technical, social and environmental challenges for a gold project development in Western TurkeyMLA: A case study of technical, social and environmental challenges for a gold project development in Western Turkey. The Australasian Institute of Mining and Metallurgy, 2018.