3?Chamber pipe feeder system (3-CPFS)

The Southern African Institute of Mining and Metallurgy
J. J. Botha
Organization:
The Southern African Institute of Mining and Metallurgy
Pages:
24
File Size:
12355 KB
Publication Date:
Jan 1, 2009

Abstract

As a Demand Side Management (DSM) Project, money was granted for the procurement and installation of a 3-Chamber Pipe Feeder System (3-CPFS) at AngloGold Ashanti?s Moab Khotsong Mine in the Vaal River Area, Orkney. The first submission was done to ESKOM in December 2002 and the contract was signed in September 2006 at a cost of R 57-million with an envisaged reduction in power of 7 Megawatt per month based on a 90% utilization factor. The project was finally commissioned in December 2008. The technology is not new, but the intent of the paper is to share with others the experience gained by using the technology in a deep-level mine in order to reduce overall power consumption.
Citation

APA: J. J. Botha  (2009)  3?Chamber pipe feeder system (3-CPFS)

MLA: J. J. Botha 3?Chamber pipe feeder system (3-CPFS). The Southern African Institute of Mining and Metallurgy, 2009.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account