If you have access to OneMine as part of a member benefit, log in through your member association website for a seamless user experience.
The commissioning of a distributed digital control system for the grinding circuit at Cuajone was completed by mid-August 1985. Development of a successful strategy, excellent operator acceptability, and the visual aspects offered by the display of the central console improved mill through- put significantly. The inherent features of a digital system enhanced the flexibility in grinding control and allowed the milk and classifiers to be operated at maximum capacity. This paper discusses the strategy development and the production restrictions encountered, and evaluates the overall performance of the digital control system. |