Recovery of additional tungsten from Climax byproduct-plant tailing

Malhotra, D. ; Burrer, G. E. ; Irwin, T. E. ; Johnson, S.
Organization: Society for Mining, Metallurgy & Exploration
Pages: 5
Publication Date: Jan 1, 1987
Climax byproduct-plant tailing assayed 0.019% WO3. Pilot-plant and laboratory tests were performed to investigate the possibility of recovering additional tungsten values from the byproduct-plant tailing. The methodology used in the study and the results of this investigation are discussed.
Full Article Download:
(350 kb)