Low capital, fast track approach to plant startup: A case study

Smith, M. E. ; Belingheri, K. M.
Organization: Society for Mining, Metallurgy & Exploration
Pages: 8
Publication Date: Jan 1, 1987
Pinson Mining Co. operates a conventional mill and two heap leach operations in north-central Nevada. The latest of these heap leach operations, the Preble project, is a low-grade, low-tonnage property made profitable through several innovative capital reduction techniques. Rapid return on investment was a prime factor in design. To facilitate this, fast-track design and construction techniques were employed. The project is a seasonal 1.5 kt/d (1 700 stpd) crush/agglomerate heap leach plant using both clay and plastic leach pads. Construction and startup were achieved through cooperative arrangements between local contractors and in-house construction personnel, with few items put out to bid. An interactive approach to design minimized lost time and construction costs.