If you have access to OneMine as part of a member benefit, log in through your member association website for a seamless user experience.
Injection of alkaline waste-lime slurry was performed at a West Virginia surface coal mine site, to attempt neutralization of acid springs by an alkaline recharge method. Deep trenching (>5 m) using an excavator yielded the most effective injection into the aquifer. Water from two springs, 90 m from the deep trench, showed 70%-80% reduction in acidity in response to injection. Neutralization persisted >170 days after treatment, with pH between 5.1-5.7 and metal acidity from 25-60 mg/L. A minor fraction of lime introduced was consumed. The sustained neutralization is attributed to reaction of acid water with subsurface lime, entrained below the wafer table by macropore infiltration. Characteristics of groundwater transport are critical in determining recharge structure location. |