Considering the importance of a fully mechanized depillaring operation, the Indian coal mining industry has introduced a number of such depillaring operations at depths of cover ranging from 60 m to 377 m. The overlying strata of these depillaring faces vary widely from highly laminated, weak and easily caveable to massive, strong and difficult to cave. Most of these mechanized depillaring operations were carried out in difficult site conditions, however, performance monitoring in the field has showed good production, productivity and safety results. Field studies have shown that the use of roof bolts as breaker line support for this technology worked well for moderate strength overlying roof strata, but experienced difficulties for both extremely weak and strong/massive overlying roof strata. It is observed that the performance of a breaker line support along the goaf edge deteriorated with an increase in depth of cover of the depillaring face. Practice of a straight line of extraction (single row of pillars) during the mechanized depillaring below competent roof strata experienced a considerably large hanging area inside the goaf, which needs to be managed either by induced caving of the roof strata or through an increase in width of the excavation. Observations of good performance of a fully mechanized depillaring face under highly laminated and weak strata at a shallow cover is mainly due to a faster rate of extraction. However, the mechanized depillaring underneath laminated and weak roof strata for a deep-seated coal seam was forced to go for partial extraction mainly due to strata control problems. Discussing the implications of main technical and operational differences between the conventional (semi-mechanized) and fully mechanized depillaring, this paper presents results of different strata control studies conducted at different mechanized depillaring sites with varying geo-mining conditions.
Full Article Download:
(1469 kb)


Additional chapters/articles from the SME-ICGCM book 33rd International Conference on Ground Control in Mining

Development of the 3D Numerical Modeling of Roof Bolts for S
Development and Application of the TT Anti?Friction Washer f
A Comparison Between ARMPS and the New ARMPS?LAM Programs
Multi?stage Testing Procedures, Verification, and Results fo
The Caterpillar HW300 Quickscan
Underground Mining Technology in Chinese Coal Mines
Rock Characterization Using Time - Series Classification Alg
Ground Control in the Underground Coal Mines of Colombia
Investigating the Contributing Factors to Rib Fatalities Thr
Analyses of De-Confinement Mechanisms of Unstable Failures i
Photogrammetric Monitoring of Rock Mass Behavior in Deep Vei
Development of An Enhanced Methodology for Ground Movement P
Estimating Coal Strength Based on Historical Laboratory Test
Experimental Observations and Interpretations on Fracture Ne
Overburden Failure Characteristics of Extra?Thick Seam Using
FlexKnot: An Innovation in Roof and Rib Surface Control
Learning Our Geotechnical Limits and Pushing Our Longwalls T
Three Dimensional Analysis of Strain and Ground Surface Disp
Use of a Plate Loading Device to Quantitatively Evaluate Wea
Ground Control Design Considerations for Reducing Longwall?I
Mechanics of Horizontal Movements Associated with Coal Mine
Roof Geotechnical Properties for Roof Control Purposes in Il
Update: Analysis and Case Study of Impact?Resistant Steel Se
The Implementation of Rock Mechanics Into a Multiple Level L
A Case Study for Multiple Seam Calibration of LaModel in Bum
A Liquid Settlement System for Measuring Roof Sag During Dev
Ground Response As a Longwall Advances Into a Backfilled Rec
A Case Study of a Low Overburden Longwall Recovery with Pre?
To What Extent the Mechanical Properties of Coal Play Role i
Mine Water Vs. Drinking Water?Technical Execution and Legal
Mitigation of a Massive Sandstone Channel?s Impact on Longwa
Study on the Modified Model of Probability Integra Method
Multi?Seam Mining Over Old Workings with Small Pillars - A C
Development of Mechanized Ground Support Installation Equipm
Understanding and Optimizing the Performance of Passive Prim
Validation of Overburden Failure Zone in Complex Extra Thick
The Impact Factors of Overburden Movement in Longwall Mining
Fiber Reinforced Polymer Rockbolts for Ground Control in a S
Introduction of a Measurement Based Ground Control Managemen
Application of Various Probing Methods for Rock Characteriza
Risk Analysis and Risk Ranking in Tunneling: A Case Study
Development of Road Header Roof Bolting Module
Combined Effects of Rock Bedding Orientation and Topography
Challenges of Room and Pillar Mining at 900 M Depths in the
Sandy Creek Waterfall?Case Study of Successful Management of
Overburden Strata Movement for the Longwall Mining of Shallo
Rock Slope Stability Comparison Between Deterministic and Pr
Stability of a Gateroad Used Simultaneously for Two Retreati
Meeting the Challenges of Floor and Sidewall Strata Control
Strata Control Investigations During Fully Mechanized Coal P
Strata Movement Around Large Mining Height Face Area with Fu
A Case Study of Topography?Related Stress Rotation Effects o
Introduction of a New Superior Coating on Ground Support Pro
Suspension Designs Required in the Logical Framework
A Novel and Effective Method to Develop Tension in a Roof Bo
Time Dependent Mining Induced Subsidence Measured by Differe
Tracking and Tracing in Terms of Transportation Logistics of