If you have access to OneMine as part of a member benefit, log in through your member association website for a seamless user experience.
During 1991 - 1993 the author interviewed approximately thirty senior managers of varying responsibilities in either the engineering, construction or operation of a heavy industrial facility. The purpose of the exercise was to determine the factors driving a deterioration of the working relationship between the engineering and the operating company following practical completion of a major project. From the research a number of conclusions have been drawn as to the root cause of the deteriorating relationship. For this paper we are drawing on this initial research and our ongoing experience of solving problems of this nature to present some fundamentals that can be used to break the breakdown maintenance cycle. |