Ulan Highwall Project

Organization: The Australasian Institute of Mining and Metallurgy
Pages: 8
Publication Date: Jan 1, 1998
HIGHWALL MINING - DECISION TO MINEUlan had completed operations in the first Open Cut area due to high stripping ratios and the presence of geological features which destroyed a significant portion of the coal in the upper part of the seam. The pit had been abandoned in 1994 and operations had moved to a new location to the north west.
Full Article Download:
(921 kb)