Integrated Whaleback Planning and Scheduling System

Organization: The Australasian Institute of Mining and Metallurgy
Pages: 8
Publication Date: Jan 1, 1986
Various software packages are discussed. These are components of an Integrated Planning and Scheduling System developed by MVM with the aim of providing up-to-date information for the Whaleback operation on: 1. Mine Topography. 2. Status of equipment in the mine. 3. Material moved from and within the mine. 4. Volume and density of same. 5. Quality of same.
Full Article Download:
(1027 kb)