Morning Star Gold Mine Recoverable Ore Reserves = Mining Geology + Practical Cents

Wright R F,
Organization: The Australasian Institute of Mining and Metallurgy
Pages: 7
Publication Date: Jan 1, 1993
This paper highlights the importance of accurate observational technical reports compiled by Mining Geologists and Engineers. Before uncovering the original reports in July 1992, all previous investigations discounted returning to old mining areas on the belief that all operations were suspended because they were 'unpayable'. However, the detail of the original reports removed any doubt of the economic value of retrieving remnant ore.The important feature was that the description of 'unpayable' by GMA could be equated to 11.6 - 35 g/t over the history of the mine. On the basis of these reports the Morning Star mine has been re-opened.
Full Article Download:
(746 kb)