The new South Mine in the Western Deep Levels complex is destined to become an ultra deep project extending to depths of 4 200 m below surface and where rock temperatures are likely to exceed 65 ¦C. Initial estimates put refrigeration requirements at 133 000 kWR. A surface refrigeration plant with an initial capacity of 42 000 kWR has been commissioned and will be used for mining the upper levels. |