Design of a Large Flexible Underground Refrigeration Installation

Brouwer G, ; Shaw J,
Organization: The Australasian Institute of Mining and Metallurgy
Pages: 7
Publication Date: Jan 1, 1988
As South African gold mines go deeper, and improved and more uniform working condi- tions are required, ever larger amounts of refrigeration are needed. At the same time new and more suitable cooling equipment is becoming available for use with new mining layouts as well as on existing shaft systems. The advent of the large diameter rotor screw compressor has meant that there is now a machine available with great flexibility in performance and construction for efficient underground use. The first installation using this type of machine is described.
Full Article Download:
(763 kb)