Selection of the mining method and most appropriate mine layout for deep open cut coal mines is discussed, giving particular attention to the types of mines expected to be developed in the future in Australia. Because of the more complex nature of these operations a large number of alternatives for mine design are available, and the constraints associated with these designs are discussed. Potential problems to be overcome are identified to allow setting of realistic targets for maximum output and build-up production rates. |