The sequence of development and back analysis of the failure of a spoil pile in the 1B pit of the Moura Mine are given. The mode of failure was a two-wedge mechanism with a basal slip plane passing through a clay band about 2 m below the pit floor. Remedial actions for improving spoil pile stability are discussed. |