One Character Effects on Copper Heap Leach Management

Organization: The Australasian Institute of Mining and Metallurgy
Pages: 6
Publication Date: Jan 1, 1998
Copper heap leaching involves both the simultaneous and sequential leaching of very large tonnages of ore over long periods of time. It is not unusual to be leaching three or four million tonnes over periods of 12 to 18 months. As a consequenc
Full Article Download:
(281 kb)