Recent Developments In Secant Bored Pile Wall Construction

Sherwood, D. E.
Organization: Deep Foundations Institute
Pages: 10
Publication Date: Jan 1, 1989
Recent developments in high torque hydraulic rotary rigs has lead to the construction of secant bored pile walls by rotary drilling methods in circumstances where earlier methods were difficult and in some cases impossible. The evolution of secant bored pile wall construction is described including classical, rotary drilled and continuous flight auger construction methods. The paper then details the restraints which have been created in recent inner city redevelopment, many of which were not relevant in the early days of the technique. Typical examples of walls are presented to show the adapatability and advantages of the secant bored pile wall method. A number of in-situ retaining wall construction techniques are then compared in detail with regard to relative cost, technical quality and practicality.