The Quality Control Of Pile Foundations Of Tall Buildings In Shenzhen

Keqiang, Li
Organization: Deep Foundations Institute
Pages: 6
Publication Date: Jan 1, 1991
Among the pile foundations of the 156 tall buildings over 18 storeys in Shenzhen, 86. 5% of them are constructed by slurry drilled piles, bored piles and excavated piles (hand-dug caissons). Based on the experiences of the engineering practices, the paper points out that the main quality problems of pile foundations in Shenzhen are: insufficient bearing capacity of single pile; poor concrete quality of pile; damage of the precast pile; pile tip not reaching the required bearing stratum and the thickness of bored/drilled sediment exceeding the specified. etc. The quality inspection methods that have been used include: check of construction records and excavating; static loading test; core sampling test; non-destructive test, etc. Treatments of quality problems used in Shenzhen are also introduced in this paper.