Stooping Low Safety Factor Pillars at Goedehoop Colliery - 12 Months Later

Makusha, Gift
Organization: International Conference on Ground Control in Mining
Pages: 9
Publication Date: Jan 1, 2004
Pre-feasibility work at Goedehoop Colliery indicated that stooping of the undersized pillars could be undertaken safely and economically. In light of the findings a decision was taken in may 2003 to undertake the project in the 600 area where three panels (628, 630 and 632) were identified for pilot test sites. The findings of the pre-feasibility studies were presented in a paper to the 22nd International Conference on Ground Control in Mining held at Morgantown in 2003 (1). This paper is a progress report for the project 12 months down the line. Work commenced to prepare the sites for mining including, acquisition of equipment, equipping the panels, selecting and training people to undertake the project. Three monitoring sites were set up distributed evenly along panel 628. Each site comprised of a surface extensometer station in the overburden strata adjacent to a pillar underground containing hard inclusion vibrating wire extensometer cells. This combination would be used to record pillar loading ahead of stooping as well as the depth of caving and strata deformation in the goal zone behind the stooping face. In July 2003, support work began to secure the roof and rib sides. The support was required to be at least three-pillar center distances ahead of the mining front to ensure that the effective stooping zone is secured at all times. The NEVID method of pillar extraction developed at Sasol and described in detail by Ismet and Moolman (2) in a Coaltech 20-20 report was adopted for the pilot project. As part of training the selected stooping team was send for a week to Sasol's Bosmanskrans Colliery to familiarize with the NEVID method of stooping. Further training sessions were carried out on site especially on the use of Mobile Roof supports. The first cut was taken on 20 August 2003 by implementing a form of chequerbord mining taking every second row of pillars. Three rows were mined this way which period was considered training to get workers familiar with the new equipment and mining method. On the fourth row the full design span equivalent to mining 4 pillars in a row was implemented taking out all the pillars in successive rows. Production figures gradually increased from 300 to more than 1,000 tons run of mine coal per shift. Panel 628 was mined out at the end of December 2003 and the second of three panels (630) is being mined. Substantial data from the monitoring set up has been recorded since the start of the project. Monitoring will continue to the end of the pilot project and the data will be analysed and fed back into the design tools to improve the design in future undertakings. The pilot project has been a success so far and other old workings are being evaluated for stooping.
Full Article Download:
(3061 kb)


Additional chapters/articles from the SME-ICGCM book 23rd International Conference on Ground Control in Mining (ICGCM) 23rd

Geomechanical Criteria of Longwall Face Support Selection at
Rock Fracture, Caving and Interaction of Face Supports Under
Effect of the Approaching Longwall Faces on Barrier and Entr
Computer Simulation of Ground Behaviour and Rock Bolt Intera
lnterpanel Barriers for Deep Western U.S. Longwall Mining
Application of Yieldable and Cuttable Pump Crib in Longwall
Field Testing of a Real Time Roof Mapping Drilling Display S
Problems in "Void" Detection in Coal Mine Water Hazards
Violent Coal Pillar Collapse -A Case Study
Stooping Low Safety Factor Pillars at Goedehoop Colliery - 1
Laboratory Strength Testing of Coal from Selected Illinois S
Downhole Overcoring Stress Measurement at a Western Undergro
Effect of In Situ Stresses on the Stability of Coal Mine Dev
SOMA: A New Method to Calculate the Operative Stress Field:
Numerical Modeling for Increased Understanding of the Behavi
Evaluation of Rockburst Hazard from Core Testing
Investigation of Electromagnetic Emissions in a Deep Undergr
Development and Application of Geotechnical and Rockmechanic
Laboratory Testing of Rib Straps
The New Two-Dimension LaModel Program
Risk Assessment: Multiseam - Single Seam Mining
A Method To Determine Expander Spacing For Steel Pipelines I
A Case Study Of Abandoned Mine Subsidence At Dominion, Nova
Spatial Trends In Rock Strength - Can They Be Determined Fro
Development And Demonstration Of An Alternate Mining Geometr
Evaluation Of Polyurethane Injection For Beltway Roof Stabil
Application Of Ground Penetrating Radar To Evaluate The Exte
A Risk Assessment Tool For Open Cast Mining In South Africa
Analysis Of Practical Ground Control Issues In Highwall Mini
Preventing Falls Of Ground In Coal Mines With Exceptionally
Geo-Mechanical Property And Failures Of Weak Roof Shales In
Eclipse System Bolting In The Illinois Basin
Variation In The Load Transfer Of Fully Encapsulated Rockbol
Bolt Load Changes During Initial Face Advance And Cross-Cut
Coal Mine Primary Support Selection: Tension Versus Non Tens
Improving Stope Support At Modikwa Platinum Mine
3D FEM Simulation For Fully Grouted Bolts
An Investigation Into The Effectiveness Of Support Systems C
Hydraulic Prestressing Units: An Innovation In Roof Support
Improving Roof Truss Performance
Coal Combustion Byproducts-Based Artificial Mine Supports -
The Influence Of Horizontal Stress On Pillar Design And Mine
Investigation Of Pillar-Roof Contact Failure In Northern App
Mapping Hazards With Microseismic Technology To Anticipate R
Practical Detection Of Underground Mine Roof Failure
Heat-Imaging Experimental Study Of Reducing Local Gas Accumu
Microcirculation Theory Analysis Of Spontaneous Combustion O