Effects of Bolt Spacing, Bolt Length, and Roof Span on Bolt Loading in a Trona Mine

Signer, Steve P.
Organization: International Conference on Ground Control in Mining
Pages: 7
Publication Date: Jan 1, 2001
Researchers from the Spokane Research Laboratory of the National Institute for Occupational Safety and Health installed 39 instrumented, fully grouted bolts at six test sites in a trona mine retreat panel to study mine roof stability for the improvement of workplace safety. Variables at each test site included bolt spacing, bolt length, roof span, and location in the panel layout. At most test sites, two rows of instrumented bolts were installed, one in or near the intersection created during development and the other in or near the intersection created during second-pass mining. The most significant factor affecting bolt load was roof span. The highest loads were on the bolts installed in the intersections of the 6 m-wide entry. Mining-induced stress resulting from panel layout was the next most significant factor affecting bolt loading. Minor varia┬Čtions in bolt loading could be attributed to changes in bolt spacing and bolt length. Gas pressure release in the immediate roof contributed to some bolts showing compressional loading during gas bleed-off.
Full Article Download:
(1752 kb)


Additional chapters/articles from the SME-ICGCM book Proceedings 20th International Conference On Ground Control In Mining

Hydraulic Fracturing Of Sandstone And Longwall Roof Control
Status Of Longwall Research In CSIRO
Longwall Moves At Twentymile Recovery Mesh System
Risk Assessment Of Geotechnical Factors Associated With Unde
Load And Deflection Response Of Ventilation Stoppings To Lon
The Stress And Failure Paths Followed By Coal Mine Roofs Dur
Simulated Materials Modeling And Analysis Of The Overburden
Sizing Of Final Stumps For Safer Pillar Extraction
Evaluation Of Mobile Roof Support Technologies
FDM Prediction Of A Yield Pillar Performance In Conjunction
Extraction Ratio In Thin Seams Assuring No Surface Subsidenc
Improving Roof Control At A South African Coal Mine
In-Situ Investigation Into The Causes Of Falls Of Roof In So
Failure Characteristics Of Roof Falls At An Underground Ston
Determination Of Limitation Of Roof Layer Separation (LRLS)
The Integration Of Geology And Engineering In Ground Control
Worldwide Implementation Of Continuous Miner System - Integr
Effect Of Face Advance Rates On The Characteristics Of Subsi
The Response Of A High Order Stream To Shallow Cover Longwal
SDPS For Windows: An Integrated Approach To Ground Deformati
Development Of A Remote Reading Dual-Height Telltale System
Enhanced Surface Control For Roof And Rib Support
Long Term Stability Of Mine Workings In Soft Floor Environme
Visualization Of Geostructure By Mechanical Data Logging Of
A Step Towards Understanding The Behaviour Of Wider Roadways
Research And Application Of Combined Reinforcement System
Estimation Of In-Situ Stress At Ikeshima Colliery Using AE A
Typical Complete Stress-Strain Curves Of Coal
Analysis Of Roof Bolt Systems
Effects Of Bedding Plane Sliding And Separation And Tensione
Systems Used In Coal Mining Development In Long Tendon Reinf
Determination And IT-Supported Evaluation Of Rock Mechanical
Tensioned Cable Bolts As Primary Support: Update
Determination Of Basis For The Double Use Of Rectangular Roc
Cost Preventive System To Control Unstable Roof In Main Line
Injection Techniques for Cost-effective Stabilization of Bri
An Analysis of Rock Failure Around a Deep Longwall Using Mic
Numerical Simulation on Microseismicity Due to Mining at One
Investigation of Seismicity Near Appin, NSW, and its Associa
Effects of Bolt Spacing, Bolt Length, and Roof Span on Bolt
Evaluation of Instrumented Cable and Rebar Bolts as Ground S
Application of the Coal Mining Roof Rating System in South A
Roof Instability Rating (RIR) System and Its Application at
Updating the NlOSH Support Technology Optimization Program (
Mistakes, Misconceptions, and Key Points Regarding Secondary
Non-Destructive Testing on Fully Grouted Rockbolts
Visual Recognition of the Load of Roof-Bolts by an Indicator
A New Rockbolt Axial Load Measuring Device
A New Approach to the Integrity Testing of Ground Anchorages
A Lineament Analysis Case Study of the Fola Coal Co., LLC. N
Analyses of Valley Fill Slope Stability - Three Case Studies
Modeling of Joint and Fracture Distributions in Rock Mass Be