This paper describes the importance of considering ground control measures when importing U.S. continuous mining technology in foreign countries. Important ground control factors are discussed. Each year the USA exports a significant amount of continuous miner equipment (i.e. continuous miners, roof bolters, coal haulers, shuttle cars, continuous haulages, scoops and feeder-breakers). International customers see the opportunity to significantly improve their productivity and increase their longwall gateroad development rates by implementing the room-and-pillar (place changing) mining systems used throughout the USA. However, a number of issues are often overlooked or not thoroughly evaluated when selecting the equipment, often resulting in lower than expected productivity. Ground control is one of the critical factors that must be addressed. Since 1993, the author has assisted numerous international customers and manufacturers with implementing or improving the performance of continuous miner and room-and-pillar systems in Australia, India, Mexico, South Africa, and the United Kingdom. An essential first step is to conduct a thorough ground control study, and then integrate its findings into mine layout, equipment selection and section operating plans. Based on actual case histories, the author will present a number of examples and "Do's and Don'ts." Another key to success is the involvement of manufacturers and suppliers with customers when implementing new systems and technology. The importance of allowing for cultural evolution by both management and workers for acceptance and successful implementation of any new system is also discussed. Over the past ten years, the global coal industry has gone through some very dramatic changes. Countries that previously experienced a freight advantage, such as Australia shipping coal to Japan and Korea versus the United States, are finding they are now in a world coal market similar to other commodities and products. Today, coal prices arc stated F.O.B. at the consumer, and the origin is often irrelevant. Also, previously state-run coal industries have been privatized, such as the United Kingdom, and others such as Poland and India are currently going through the same transition from state-run to the private sector. In all cases, the key to continued viability, or survival, depends largely on reducing costs in order to compete for a market share. Two ways exist to reduce costs. First, almost everyone tries to reduce expenditures. Depending on the circumstances at a given mine or in a specific country, this helps to some point. However, most find that secondly, production must be increased to achieve the necessary cost reductions to compete in today's global coal market. As a result, over the past ten years, foreign companies and countries have looked to the USA for new mining methods and systems to significantly increase productivity. Thus, a major portion of American equipment manufacturers and suppliers sales have been exports, which has played a major role in helping to "keep-the-doors-open" for a number of companies through the lean 1990's, when American coal companies were postponing capital expenditures and expansions. As foreign companies and countries have looked to the USA for ways to improve productivity, they have become particularly interested in continuous miner equipment systems and most often "room-and-pillar," "bord-and-pillar" or "place changing" mining systems for four reasons. First, in countries such as the United Kingdom and Germany, who have been longwall mining for generations, there remain numerous remnant small pockets of reserves in existing mines that are either too small or too difficult to longwall mine, and are conducive to the flexibility of continuous miner systems. Second, for countries such as Australia, who have experienced the constant problem of developing longwall gateroads in a timely manner to avoid longwall move delays, new or alternate methods are required. Third, companies and countries using roadheader machines on coal production are recognizing the increased productivity potential of continuous miner equipment. Fourth, countries such as South Africa and India, where a substantial amount of the production comes from conventional mining methods, "drill-and-blast", companies are recognizing the opportunity to improve by implementing continuous miner technology. Colliers & Associates, Inc. has found that over the past eight years too often foreign companies or countries purchase American continuous miner equipment without first conducting a thorough geologic, geotechnical and ground control study for the reserves to be mined. The problems are compounded by not developing mine plans, and submitting them to the regulatory authorities for approval prior to purchasing and even implementing the equipment.
Full Article Download:
(888 kb)


Additional chapters/articles from the SME-ICGCM book Proceedings 20th International Conference On Ground Control In Mining

Hydraulic Fracturing Of Sandstone And Longwall Roof Control
Status Of Longwall Research In CSIRO
Longwall Moves At Twentymile Recovery Mesh System
Risk Assessment Of Geotechnical Factors Associated With Unde
Load And Deflection Response Of Ventilation Stoppings To Lon
The Stress And Failure Paths Followed By Coal Mine Roofs Dur
Simulated Materials Modeling And Analysis Of The Overburden
Sizing Of Final Stumps For Safer Pillar Extraction
Evaluation Of Mobile Roof Support Technologies
FDM Prediction Of A Yield Pillar Performance In Conjunction
Extraction Ratio In Thin Seams Assuring No Surface Subsidenc
Improving Roof Control At A South African Coal Mine
In-Situ Investigation Into The Causes Of Falls Of Roof In So
Failure Characteristics Of Roof Falls At An Underground Ston
Determination Of Limitation Of Roof Layer Separation (LRLS)
The Integration Of Geology And Engineering In Ground Control
Worldwide Implementation Of Continuous Miner System - Integr
Effect Of Face Advance Rates On The Characteristics Of Subsi
The Response Of A High Order Stream To Shallow Cover Longwal
SDPS For Windows: An Integrated Approach To Ground Deformati
Development Of A Remote Reading Dual-Height Telltale System
Enhanced Surface Control For Roof And Rib Support
Long Term Stability Of Mine Workings In Soft Floor Environme
Visualization Of Geostructure By Mechanical Data Logging Of
A Step Towards Understanding The Behaviour Of Wider Roadways
Research And Application Of Combined Reinforcement System
Estimation Of In-Situ Stress At Ikeshima Colliery Using AE A
Typical Complete Stress-Strain Curves Of Coal
Analysis Of Roof Bolt Systems
Effects Of Bedding Plane Sliding And Separation And Tensione
Systems Used In Coal Mining Development In Long Tendon Reinf
Determination And IT-Supported Evaluation Of Rock Mechanical
Tensioned Cable Bolts As Primary Support: Update
Determination Of Basis For The Double Use Of Rectangular Roc
Cost Preventive System To Control Unstable Roof In Main Line
Injection Techniques for Cost-effective Stabilization of Bri
An Analysis of Rock Failure Around a Deep Longwall Using Mic
Numerical Simulation on Microseismicity Due to Mining at One
Investigation of Seismicity Near Appin, NSW, and its Associa
Effects of Bolt Spacing, Bolt Length, and Roof Span on Bolt
Evaluation of Instrumented Cable and Rebar Bolts as Ground S
Application of the Coal Mining Roof Rating System in South A
Roof Instability Rating (RIR) System and Its Application at
Updating the NlOSH Support Technology Optimization Program (
Mistakes, Misconceptions, and Key Points Regarding Secondary
Non-Destructive Testing on Fully Grouted Rockbolts
Visual Recognition of the Load of Roof-Bolts by an Indicator
A New Rockbolt Axial Load Measuring Device
A New Approach to the Integrity Testing of Ground Anchorages
A Lineament Analysis Case Study of the Fola Coal Co., LLC. N
Analyses of Valley Fill Slope Stability - Three Case Studies
Modeling of Joint and Fracture Distributions in Rock Mass Be