The depletion of thicker coal reserves has resulted in the thinner seams being economically attractive. Surface protection against subsidence limits the extraction ratio to 50% for the room and pillar method as a "no subsidence condition". That rule was developed for pillars with smaller width/height ratio because seams mined at the time were commonly 6 feet thick. Over time pillar ribs deteriorate around the pillar perimeter and thus decrease the area of the pillar. Using 50% extraction as the no subsidence condition in the squat pillar category (below 42 in with w/h > 7) causes unnecessary losses of reserves because squat pillars are stronger. In this paper a method is presented for design of long-term pillars. Based on the analysis of pillar deterioration and field observations, an increase of the "no subsidence" extraction rate to 60% for squat pillars is proposed.
Full Article Download:
(2166 kb)


Additional chapters/articles from the SME-ICGCM book Proceedings 20th International Conference On Ground Control In Mining

Hydraulic Fracturing Of Sandstone And Longwall Roof Control
Status Of Longwall Research In CSIRO
Longwall Moves At Twentymile Recovery Mesh System
Risk Assessment Of Geotechnical Factors Associated With Unde
Load And Deflection Response Of Ventilation Stoppings To Lon
The Stress And Failure Paths Followed By Coal Mine Roofs Dur
Simulated Materials Modeling And Analysis Of The Overburden
Sizing Of Final Stumps For Safer Pillar Extraction
Evaluation Of Mobile Roof Support Technologies
FDM Prediction Of A Yield Pillar Performance In Conjunction
Extraction Ratio In Thin Seams Assuring No Surface Subsidenc
Improving Roof Control At A South African Coal Mine
In-Situ Investigation Into The Causes Of Falls Of Roof In So
Failure Characteristics Of Roof Falls At An Underground Ston
Determination Of Limitation Of Roof Layer Separation (LRLS)
The Integration Of Geology And Engineering In Ground Control
Worldwide Implementation Of Continuous Miner System - Integr
Effect Of Face Advance Rates On The Characteristics Of Subsi
The Response Of A High Order Stream To Shallow Cover Longwal
SDPS For Windows: An Integrated Approach To Ground Deformati
Development Of A Remote Reading Dual-Height Telltale System
Enhanced Surface Control For Roof And Rib Support
Long Term Stability Of Mine Workings In Soft Floor Environme
Visualization Of Geostructure By Mechanical Data Logging Of
A Step Towards Understanding The Behaviour Of Wider Roadways
Research And Application Of Combined Reinforcement System
Estimation Of In-Situ Stress At Ikeshima Colliery Using AE A
Typical Complete Stress-Strain Curves Of Coal
Analysis Of Roof Bolt Systems
Effects Of Bedding Plane Sliding And Separation And Tensione
Systems Used In Coal Mining Development In Long Tendon Reinf
Determination And IT-Supported Evaluation Of Rock Mechanical
Tensioned Cable Bolts As Primary Support: Update
Determination Of Basis For The Double Use Of Rectangular Roc
Cost Preventive System To Control Unstable Roof In Main Line
Injection Techniques for Cost-effective Stabilization of Bri
An Analysis of Rock Failure Around a Deep Longwall Using Mic
Numerical Simulation on Microseismicity Due to Mining at One
Investigation of Seismicity Near Appin, NSW, and its Associa
Effects of Bolt Spacing, Bolt Length, and Roof Span on Bolt
Evaluation of Instrumented Cable and Rebar Bolts as Ground S
Application of the Coal Mining Roof Rating System in South A
Roof Instability Rating (RIR) System and Its Application at
Updating the NlOSH Support Technology Optimization Program (
Mistakes, Misconceptions, and Key Points Regarding Secondary
Non-Destructive Testing on Fully Grouted Rockbolts
Visual Recognition of the Load of Roof-Bolts by an Indicator
A New Rockbolt Axial Load Measuring Device
A New Approach to the Integrity Testing of Ground Anchorages
A Lineament Analysis Case Study of the Fola Coal Co., LLC. N
Analyses of Valley Fill Slope Stability - Three Case Studies
Modeling of Joint and Fracture Distributions in Rock Mass Be