Sizing Of Final Stumps For Safer Pillar Extraction

Mark, Christopher
Organization: International Conference on Ground Control in Mining
Pages: 8
Publication Date: Jan 1, 2001
Pillar recovery continues to be one of the more hazardous activities in underground coal mining. Safety requires that the roof above the intersection remain stable until after the pillar has been extracted. Artificial supports (timbers and Mobile Roof Supports) arc essential to roof stability, but so is the final remnant stump or pushout. Traditional mining practices usually called for the complete extraction of the final stump, but the recent trend (both in the U.S. and internationally) seems to be towards mining plans that leave a remnant stump. For this study, a sample of roof control plans from the Mine Health and Safety Administration (MSHA) Coal Districts were analyzed to determine current pillar recovery practices. Both full- and partial- extraction plans were included. Special attention was paid to whether plans require that a final stump be left, and whether requirements regarding the dimensions of the remnant stump are included. Foreign experience with final stumps is also summarized. It seems that the risk of major pillar falls can often be reduced by leaving final stumps that are large enough to protect the intersection, but small enough that they do not inhibit the caving of the gob. Because final stumps are often irregular in shape, a new approach for estimating their strength is described. Analyses were conducted to assess the effect of seam height and depth of cover on the potential variation in the size of remnant stumps.
Full Article Download:
(2090 kb)


Additional chapters/articles from the SME-ICGCM book Proceedings 20th International Conference On Ground Control In Mining

Hydraulic Fracturing Of Sandstone And Longwall Roof Control
Status Of Longwall Research In CSIRO
Longwall Moves At Twentymile Recovery Mesh System
Risk Assessment Of Geotechnical Factors Associated With Unde
Load And Deflection Response Of Ventilation Stoppings To Lon
The Stress And Failure Paths Followed By Coal Mine Roofs Dur
Simulated Materials Modeling And Analysis Of The Overburden
Sizing Of Final Stumps For Safer Pillar Extraction
Evaluation Of Mobile Roof Support Technologies
FDM Prediction Of A Yield Pillar Performance In Conjunction
Extraction Ratio In Thin Seams Assuring No Surface Subsidenc
Improving Roof Control At A South African Coal Mine
In-Situ Investigation Into The Causes Of Falls Of Roof In So
Failure Characteristics Of Roof Falls At An Underground Ston
Determination Of Limitation Of Roof Layer Separation (LRLS)
The Integration Of Geology And Engineering In Ground Control
Worldwide Implementation Of Continuous Miner System - Integr
Effect Of Face Advance Rates On The Characteristics Of Subsi
The Response Of A High Order Stream To Shallow Cover Longwal
SDPS For Windows: An Integrated Approach To Ground Deformati
Development Of A Remote Reading Dual-Height Telltale System
Enhanced Surface Control For Roof And Rib Support
Long Term Stability Of Mine Workings In Soft Floor Environme
Visualization Of Geostructure By Mechanical Data Logging Of
A Step Towards Understanding The Behaviour Of Wider Roadways
Research And Application Of Combined Reinforcement System
Estimation Of In-Situ Stress At Ikeshima Colliery Using AE A
Typical Complete Stress-Strain Curves Of Coal
Analysis Of Roof Bolt Systems
Effects Of Bedding Plane Sliding And Separation And Tensione
Systems Used In Coal Mining Development In Long Tendon Reinf
Determination And IT-Supported Evaluation Of Rock Mechanical
Tensioned Cable Bolts As Primary Support: Update
Determination Of Basis For The Double Use Of Rectangular Roc
Cost Preventive System To Control Unstable Roof In Main Line
Injection Techniques for Cost-effective Stabilization of Bri
An Analysis of Rock Failure Around a Deep Longwall Using Mic
Numerical Simulation on Microseismicity Due to Mining at One
Investigation of Seismicity Near Appin, NSW, and its Associa
Effects of Bolt Spacing, Bolt Length, and Roof Span on Bolt
Evaluation of Instrumented Cable and Rebar Bolts as Ground S
Application of the Coal Mining Roof Rating System in South A
Roof Instability Rating (RIR) System and Its Application at
Updating the NlOSH Support Technology Optimization Program (
Mistakes, Misconceptions, and Key Points Regarding Secondary
Non-Destructive Testing on Fully Grouted Rockbolts
Visual Recognition of the Load of Roof-Bolts by an Indicator
A New Rockbolt Axial Load Measuring Device
A New Approach to the Integrity Testing of Ground Anchorages
A Lineament Analysis Case Study of the Fola Coal Co., LLC. N
Analyses of Valley Fill Slope Stability - Three Case Studies
Modeling of Joint and Fracture Distributions in Rock Mass Be