Hydraulic Fracturing Of Sandstone And Longwall Roof Control - Implementation And Evaluation

Su, D. W. H.
Organization: International Conference on Ground Control in Mining
Pages: 10
Publication Date: Jan 1, 2001
Following a roof fall in the B12 headgate of a CONSOL Pennsylvania Coal Company (CCPC) underground coal mine in February 1998, CONSOL R&D and Exploration initiated an underground roof geology reconnaissance program along the B13 and B14 developments to define potential roof instability areas and to recommend appropriate supplemental headgate support. This reconnaissance program revealed the presence of a thick, massive Pittsburgh sandstone channel overlying the B13 and B14 panels. Surface and underground core holes confirmed the close proximity and the very massive, nonlaminated nature of the sandstone. To mitigate anticipated adverse conditions at the B 13 and B 14 longwall faces due to delayed caving of the massive sandstone behind the shields, a task force consisting of Operations, Exploration, and R&D personnel was formed in May 1998. Several operational adjustments were made by mine management, including repairing damaged lemniscate links, maintaining immediate forward shield support, and implementing measures recommended by the task force intended to boost the shield set load density at the face. After reviewing available geotcchnical information, the task force also recommended fracing of the massive sandstone over the B13 and B14 panels to enhance caving characteristics and further reduce the bending-induced stresses in the sandstone near the face. Horizontal fracs were created at a horizon about 25 feet above the Pittsburgh seam main bench over the two panels in June and November 1998, respectively. To evaluate the effect of sandstone fracing and operational adjustments on the bending-induced stresses in the sandstone, three finite element models were constructed and analyzed. Results from the finite element analyses indicate that one horizontal frac, 25 feet above the Pittsburgh seam, would reduce the bending-induced stresses in the sandstone by approximately 50 percent, maintaining them at a level below the ultimate strength of the sandstone. Operational adjustments to increase the support set load density and support stiffness could reduce the bending-induced stresses in the sandstone by a maximum of an additional 10 percent. Shield pressure monitoring at the B14 midface confirmed the presence of a lower roof pressure zone inby and outby the 1314 frac holes. This lower face pressure significantly contributed to improving the B13 and B14 longwall productivity and safety. The total production downtime due to bad top at the B 12 face within the interval of channel influence was 30,600 minutes compared to about 3,500 minutes each for the B13 and B14 faces. The average longwall advance per machine shift for the B13 and B14 faces within the channel was about 70 percent higher than that for the B 12 face.
Full Article Download:
(2416 kb)


Additional chapters/articles from the SME-ICGCM book Proceedings 20th International Conference On Ground Control In Mining

Hydraulic Fracturing Of Sandstone And Longwall Roof Control
Status Of Longwall Research In CSIRO
Longwall Moves At Twentymile Recovery Mesh System
Risk Assessment Of Geotechnical Factors Associated With Unde
Load And Deflection Response Of Ventilation Stoppings To Lon
The Stress And Failure Paths Followed By Coal Mine Roofs Dur
Simulated Materials Modeling And Analysis Of The Overburden
Sizing Of Final Stumps For Safer Pillar Extraction
Evaluation Of Mobile Roof Support Technologies
FDM Prediction Of A Yield Pillar Performance In Conjunction
Extraction Ratio In Thin Seams Assuring No Surface Subsidenc
Improving Roof Control At A South African Coal Mine
In-Situ Investigation Into The Causes Of Falls Of Roof In So
Failure Characteristics Of Roof Falls At An Underground Ston
Determination Of Limitation Of Roof Layer Separation (LRLS)
The Integration Of Geology And Engineering In Ground Control
Worldwide Implementation Of Continuous Miner System - Integr
Effect Of Face Advance Rates On The Characteristics Of Subsi
The Response Of A High Order Stream To Shallow Cover Longwal
SDPS For Windows: An Integrated Approach To Ground Deformati
Development Of A Remote Reading Dual-Height Telltale System
Enhanced Surface Control For Roof And Rib Support
Long Term Stability Of Mine Workings In Soft Floor Environme
Visualization Of Geostructure By Mechanical Data Logging Of
A Step Towards Understanding The Behaviour Of Wider Roadways
Research And Application Of Combined Reinforcement System
Estimation Of In-Situ Stress At Ikeshima Colliery Using AE A
Typical Complete Stress-Strain Curves Of Coal
Analysis Of Roof Bolt Systems
Effects Of Bedding Plane Sliding And Separation And Tensione
Systems Used In Coal Mining Development In Long Tendon Reinf
Determination And IT-Supported Evaluation Of Rock Mechanical
Tensioned Cable Bolts As Primary Support: Update
Determination Of Basis For The Double Use Of Rectangular Roc
Cost Preventive System To Control Unstable Roof In Main Line
Injection Techniques for Cost-effective Stabilization of Bri
An Analysis of Rock Failure Around a Deep Longwall Using Mic
Numerical Simulation on Microseismicity Due to Mining at One
Investigation of Seismicity Near Appin, NSW, and its Associa
Effects of Bolt Spacing, Bolt Length, and Roof Span on Bolt
Evaluation of Instrumented Cable and Rebar Bolts as Ground S
Application of the Coal Mining Roof Rating System in South A
Roof Instability Rating (RIR) System and Its Application at
Updating the NlOSH Support Technology Optimization Program (
Mistakes, Misconceptions, and Key Points Regarding Secondary
Non-Destructive Testing on Fully Grouted Rockbolts
Visual Recognition of the Load of Roof-Bolts by an Indicator
A New Rockbolt Axial Load Measuring Device
A New Approach to the Integrity Testing of Ground Anchorages
A Lineament Analysis Case Study of the Fola Coal Co., LLC. N
Analyses of Valley Fill Slope Stability - Three Case Studies
Modeling of Joint and Fracture Distributions in Rock Mass Be