With the inevitable expansion of homes, businesses, and infrastructure in coal mining regions, the potential for future subsidence above abandoned mines is of increasing concern. Of particular concern are areas underlain by room-and-pillar coal mines. Unlike areas above longwall mines, where total extraction causes subsidence in a predictable and timely manner, subsidence above room-and-pillar mines is difficult to predict and may be active for many decades. As part of a geotechnical assessment of a water pipeline replacement project, NSA Engineering recently performed an evaluation of tong-terns subsidence potential along the proposed alignment due to time¬dependent failure of underlying room-and-pillar workings. The alignment of the replacement pipeline closely follows an existing concrete pipeline, which lies 150 11 to 300 fl above workings that both pre- and post-date the pipeline. Annual surveys along the existing alignment indicate that some subsidence has occurred, primarily from partial pillaring performed in the early 1980's, but that this subsidence is not active. Using the boundary-clement code LAMODEL as the primary analysis tool, NSA followed a three-step approach to estimate future subsidence impacts on the replacement pipeline. First, historical information for the mine was compiled, allowing for calibration of models to actual field conditions. Then, numerical models of workings directly under and adjacent to the proposed alignment were nun, with model input parameters varied until resulting loading patterns matched historical data, and subsidence in the model approximated that measured along survey lines. Finally, time-dependent deterioration of coal pillars was simulated by decreasing the coal strength in the calibrated model until a realistic "worst-case" condition (stability of barriers, but Yielding of production pillars and pillar remnants) was attained. Subsidence from the previous calibrated model was then subtracted from that of the worst case model to estimate future subsidence and related ground movement parameters that slay occur along the proposed alignment. The replacement pipeline design, incorporating couplings capable of withstanding the ground movements predicted, is now being finalized.
Full Article Download:
(2468 kb)


Additional chapters/articles from the SME-ICGCM book Proceedings 19th International Conference On Ground Control In Mining

An Approach To Identifying Geological Properties From Roof B
Field Experience Of Measuring The Acoustic Energy From A Ham
Advancements In Reflective Seismic Tomography For The Locati
Longwall Geomechanics, An Australian Perspective
Moonee Colliery: Renewing The Economic Viability Of A Mine U
Successful Application Of Hydraulic Fracturing To Control Wi
Pillar Mining And Longwalling Below Massive Roof Strata: Geo
High Capacity Tensioned Cable Bolts For Tailgate Support
Single Point And Full Scale Laboratory Testing Of Timber Cho
Optimizing Secondary Roof Support With The NIOSH Support Tec
The Use Of Cribless Tailgates In Longwall Extraction
Five Stress Factors Conducive To Bumps In Utah, USA, Coal Mi
Development Of Stress Measurement Techniques In Bump-Prone C
Coal Mine Seismicity And Bumps: Historical Case Studies And
Multi-Scale Assessment Of Coal And Gas Outbursts Based On Fr
Horizontal Stress: The Root Of All Evil?
Utilizing The ?Advance And Relieve? Method To Reduce Horizon
Regional Horizontal Surface Displacements Due To Mining Bene
Prognosis And Control Of Mining Induced Surface Subsidence A
Prediction Of Subsurface Subsidence For Longwall Mining Oper
Development Of A Statistical Technique For Assessing Sandsto
Evaluation Of Surface Subsidence Potential Along A Pipeline
Roof Monitoring In Limestone Mines-Experience With The Roof
Site Characterization For Planning Underground Stone Mines
Potential Problems Related To Mining Under Or Adjacent To Fl
Mine Planning For Longwall And Pillar Retreat Panels Subject
Optimization Of District-Wide Mine Layout In Multi-Seam Mini
Application Of Bolt Design Criteria At Galatia Mine
The Utilization Of Rockbolting Technology And Monitoring Tec
Rockbolting For Highly Stressed Roadways
Evaluation Of Measurement System For Monitoring The Stabilit
Quality Management For Grouted Rockbolts
Evaluating Anchorage Mechanisms Of Fully Encapsulated Rock B
INST√°L CableOx: A New Tensionable & Corrosion Resistant Cabl
Rock Reinforcement Longevity
Progress In The Development Of A Roof Bolt Design Methodolog
Case Studies Of Progressive Pillar Failure In Two Mines Usin
Jointing Effects On Pillar Strength
Impact Of Vertical Stress On Roadway Conditions At Dartbrook
Stepwise Support Technology For Extremely Soft Rock Roadway
Mobile Roof Supports For Pillar Retreat Mining
Three-Dimensional Simulations Of The Roof Behavior In Coal R
Roof Behavior In South African Coal Room And Pillar Panels
Extended Cut Out Distances In Continuous Miner Sections In S
Roof Control Analysis In North River Mine
Analysis Of The Seam Inclination Effect On Roof Stability
The Application Of Rock Mass Classification Principles To Co
Mining Geotechnical Benchmarking
Using The Point Load Test To Determine The Uniaxial Compress
The Influence Of Water Content On Strength Characteristic Of
Polymer Membrane Liners In Underground Coal Mines - Ground C
Applications Of Cement Grouting Method For Controlling Weak
Analysis Of Safety Aspects And Mining Practices For Effectiv