Design Methodology For Standing Secondary Roof Support In Longwall Tailgates

Mucho, Thomas P.
Organization: International Conference on Ground Control in Mining
Pages: 13
Publication Date: Jan 1, 1999
Maintaining ground stability in the gate roads, particularly the tailgate, has always been critical to the success of longwall mining, both in terms of safety and productivity. Several new support technologies have been developed in recent years to replace conventional wood and concrete cribbing for secondary roof support. Since their performance characteristics are unique, the best practices that have been developed with conventional wood cribbing may not be applicable for these alternative support technologies. Therefore, with so many options to consider and the importance of achieving adequate ground control at minimal cost, the trial and error approach to longwall gate road support is no longer prudent. This paper discusses a design methodology for standing secondary tailgate supports. This design technique requires in-mine measurements of tailgate support loading and convergence to establish a tailgate ground reaction behavior based on the support and strata interaction. The methodology uses the performance characteristics generated in the National Institute of Occupational Safety and Health (NIOSH) Mine Roof Simulator (MRS) to match the stiffness and load characteristics of various supports to the measured ground reaction behavior. It can be used to determine the appropriate application of alternative roof support systems or to design in-mine trials such that a fair and equitable comparison of different support systems can he made. A case study of the methodology at a western Pennsylvania mine site is presented in the paper, including a comparison of four alternative support technologies to conventional wood and concrete cribbing historically used at this particular mine.
Full Article Download:
(3883 kb)


Additional chapters/articles from the SME-ICGCM book Proceedings - 18th International Conference on Ground Control in Mining

Pillar Collapse at Welgedacht Colliery, South Africa: A Case
Causes of Massive Directional Roof Falls in Room and Pillar
Catastrophic Collapse Of Highwall Web Pillars And Preventati
Mine Panel Collapse - Two Case Studies
Roof Geology Mapping In Underground Coal Mines
Electromagnetic Seam Wave Mapping Of Roof Rock Conditions Ac
Geological Conditions At Continuous Miner Sections; Examples
The Role Of Engineering And Geology In Analyzing Ground Cont
The Development And Use Of Risk Assessment Techniques To Ass
Time-Dependent Analysis Of Underground Opening Stability
Tekflex As A Sprayon Screen Replacement In An Underground Ha
Tunnel Deformation Monitoring "Action Levels" In Coal Mines
Skin Failure Of Roof And Rib In Underground Coal Mines
Application Of Polyurethane Injection For Rehabilitation Of
Design Considerations For Bump-Prone Longwall Mines
Design Methodology For Standing Secondary Roof Support In Lo
Modern Shield Technology: Better Than Ever But Still Not Per
Shield Monitoring To Forecast Severe Face Weightings At The
Monitoring Of Longwall Seal Behaviour For Permeability And S
Ground Control In South African Coal Mines - A U.S. Perspect
Rock Mechanics Issues In The Trona Patch
Highwall Augering In Ultra-Thick Western Coal Reserves: Uniq
Seismic Events Due To Underground Mining Activities
Control Technology For Roof Drill Operators
Resin Annulus Size Effects On Rebar Bolt Pull Strength And R
Roof Bolt Response To Shear Stress: Laboratory Analysis
Laboratory Study Of Shear Loading And Bolt Load Transfer Mec
Analysis Of Cable Bolt Performance Using Numerical Modeling
Roof Bolting Application In Longwall Mining In Indonesia And
Ground Control Design For Multiple Seam Mining Using Finite
Pillar Design Issues For Underground Stone Mines
Calibration Of The Analysis Of Longwall Pillar Stability (AL
Mine Convergence When Using Mobile Roof Supports In Pillar R
The Advance And Relieve Mining Method: A Horizontal Stress C
Localized Horizontal Stress And Its Effect On Ground Control
Prediction And Control Of Surface Subsidence Over Abandoned
Effects Of Mining On Underground Infrastructures In The Germ
Ground Deformation In The Case Of Underground Mining Of Thic
Prevention Of Time-Dependent Subsidence By Elimination Of Gr