Comparative Case Study Of Yielding And Critical Coal Pillar Designs In Bump-Prone Strata

Koehler, J. R.
Organization: International Conference on Ground Control in Mining
Pages: 12
Publication Date: Jan 1, 1995
The failure of yield pillar-based gate mad designs to provide adequate ground control performance is primarily related to the use of "critically" sized chain pillars. A "critical" pillar is one that falls into a range of pillar sizes that are too large to either yield nonviolently or yield before the roof and floor sustain permanent damage, but are too small to support full longwall abutment loads. To directly compare the in-mine performance of critical and yielding pillar designs, the U.S. Bureau of Mines recently completed a field study in a tapering gate road at the Sunnyside No. 1 Mine, Sunnyside, UT. Extreme pillar stresses and associated coal bumps characterize the response to first panel mining of a 16.8-m-wide critical design. Significantly lower pillar stresses, early yielding of the pillar and adjacent panel rib, and an absence of coal bumps suggest that a narrower 12.2-m-wide design more closely approaches proper yield pillar dimensions. Probehole drilling of several 10.6-m-wide pillars revealed low stress levels and substantial pillar and panel rib yielding prior to abutment onset. suggesting a properly functioning yield pillar design.
Full Article Download:
(3751 kb)


Additional chapters/articles from the SME-ICGCM book Proceedings of 14th International Conference on Ground Control in fining

Truss Systems For Longwall Tailgate Support - Update
Cable Support Systems For Longwall Gate Road Stability
Innovative Tailgate Support For Heavy Ground: 11 Left Longwa
Parameters Affecting Resin-Anchored Cable Bolt Performance:
Roof Support Performance In High Stress Conditions
Regional Horizontal Stress And Its Effect On Longwall Mining
Deformation Development Around Mine Roadways And Simulation
Monitoring Mobile Roof Supports
Analysis Of Retreat Mining Pillar Stability
Planning And Design For Barrier Pillar Recovery Three Case H
Influence Of Partings In A Coal Seam On Long Term Pillar Sta
A Cooperative Study Of Gate Entry Designs Welbeck Colliery (
Comparative Case Study Of Yielding And Critical Coal Pillar
Comparison Of Empirical, Analytical, And Numerical Methods O
Nonlinear Approach For Determining Design Criteria For Yield
In-Situ Coal Strength Determination - Case Studies
The Design And Application Of Propsetter? In Underground Coa
Renewed Interest In Prop Supports As A Replacement For Wood
Improved Intersection Design And Monitoring In The Sydney Co
Drivage System In Retreat Longwall Gateroad
Case Study Of Stability Investigations Related To Shallow Un
Analysis Of Rockbolt Performance At The Waste Isolation Pilo
Continuous Improvement In Cuttable Coal Rib Support In Austr
Floor Failure Induced By Lateral Stress Ahead Of Longwall Su
Towards A Method Of Determining Floor Quality In An Undergro
Chinese And North American High-Extraction Underground Coal
Integration Of CAD-Based Mine Planning And Subsidence Engine
Development Of A Subsidence Database And Determination Of Su
Statistical Regional Calibration Of Subsidence Prediction Mo
Subsidence Monitoring Results, Thick Seam Longwall Mining In
Application Of Mechanical And Groundwater-Flow Models To Pre
The Application Of Underground In-Seam Seismic Methods (UISS
Vertical Stress Redistribution Around A Retreating Longwall
Entry Stability Monitoring & Analysis For Longwall & Continu
A Case Study Of A Deformation Mechanism Around A Two-Entry G
Multiseam Mining On South African Collieries
Design And Planning Of Lower Seam Longwall Gateroads
Optimizing Pillar Design In A Multi-Seam Environment