If you have access to OneMine as part of a member benefit, log in through your member association website for a seamless user experience.
The U.S. Bureau of Mines, in cooperation with the Cyprus- Plateau Mining Company, has conducted research to provide an alternative to traditional secondary support systems in a two-entry, yield pillar gate road. As recent as two years ago, it was impossible to imagine a gate road supported solely with internal high-strength resin-grouted cable supports that would virtually eliminate the necessity for crib or concrete external supports. The support system evaluated consisted of 1.6-m (5-ft) full-column resin-grouted bolts and 4.8-m (164) long cable supports installed in conjunction with wire mesh and "monster-mats." Cable loading and roof deformations were monitored to evaluate the behavior of the immediate and main roofs during first and second panel extractions. The stress and loading histories for the panels and yield pillar were monitored to evaluate the stress transfer and pillar performance in conjunction with the roof and floor behavior. The test results indicated that the designed support system successfully maintained the roof during the extraction of two longwall panels and dramatically reduced the cost of secondary support. This paper will describe the theory of a cribless support system, the advantages of cable supports, and present the pillar, roof, and floor measurements made to assess the support performance during longwall retreat mining. |