Hazard Mapping Combining Geostatistical Modeling Of Coal Mine Roof Quality Ratings With Numerical Modeling Of Stress Data

Riefenberg, J.
Organization: International Conference on Ground Control in Mining
Pages: 8
Publication Date: Jan 1, 1994
U.S. Bureau of Mines (USBM) researchers are developing a personal computer-based hazard mapping system for use in underground coal mines. Hazard mapping is rapidly gaining interest as delineating areas of possible instability is becoming more complex. The development of a hazard map is based on the consensus that combined effects of local and regional stresses, roof, floor, and rib quality, geology, faulting, presence of ground water, etc., all contribute to stability of the ground. In order to demonstrate the concept, a hazard map was developed that combined stresses anticipated to occur in a multiseam setting using numerical modeling, and the newly developed Coal Mine Roof Rating (CMRR) where roof quality ratings in untested areas were modeled using geostatistical methods. Ten borescope readings from an underground mine were used to compute CMRR's for the geostatistical analysis. CMRR's for the mine ranged from 57 to 77, and are considered in the moderate to strong range. A hazard map was developed by combining the stress effects of interseam mining, scaled to weigh equally with CMRR's, and CMRR geostatistical analysis results. This hazard map demonstrates a synergistic effect between the mining-induced stress fields and the roof quality ratings, indicating, as expected, a greater hazard index in areas of high stress and lesser roof quality.
Full Article Download:
(2230 kb)


Additional chapters/articles from the SME-ICGCM book Proceedings of 13th International Conference on Ground Control in Mining

Cable Bolting - Potential Applications For Variable Strata C
Evaluation Of Support Performance In A Highly Stressed Mine
Operational Experience With FLEXIBOLT Systems In Australian
Roofbolting In The Cape Breton Development Corporation'
Some Factors Influencing Stability Of Longwall Gateroad
Design Of Roadway Support Using A Strain Softening Model
Automation Of A Progressive Failure Procedure For Analysis O
The Massive Collapse Of Coal Pillars - Case Histories From T
Time Dependent Strength Of Coal Strata For Long-Term Pillar
Yield Pillar Behavior At Jim Walter No. 7 Mine Stress And St
A Comparison Of Overburden Response Due To Longwall Mining
Longwall Ground Behavior Characteristics In The Illinois Coa
Cavability Study Of A Competent Roof - A Case Study
Roof Pressure Monitoring Using The Integrated Longwalt Autom
Longwall Production, Maintenance, And Roof Control System
The Design And Selection Of Powered Supports For Application
Tailgate Support Practice In U.S. Longwall Mines - A Survey
Influence Of Support Capacity And Geometry On Tailgate Suppo
Innovative Concept In Tailgate Entry Support: Elimination Of
Resin-Grouted Cables For Longwall Tailgate Support Stability
Tailgate Roadway Convergence: A Key Indicator Of Potential G
Assessment Of Wood And Alternative Materials For Supplementa
Experience With The Boundary Element Method Of Numerical Mod
The Fault At The End Of The Tunnel
Microseismic Monitoring In The Sydney Coalfield
Realistic Design Of Ground Control Based On Geotechnical Dat
Underground High Resolution Seismic Method As A Low Cost Alt
Pillarless Longwall Mining For Multiple Seams
Stable Entry Design In A Multi-Seam Environment
Evaluating Roof Control In Underground Coal Mines With The C
Hazard Mapping Combining Geostatistical Modeling Of Coal Min
Stereological Sampling And Analysis For Characterizing Disco
Determining Horizontal Stress Direction Using The Stress Map
Stability And Stress Evaluation In Mines Using In-Seam Seism
Hydrogeologic Effects Of Subsidence At A Longwall Mine In Th
Monitoring Railroad Response To Mining Subsidence And Assess
Study On The High-Pressure Grouting Of The Overburden For Su