Evaluation Of Support Performance In A Highly Stressed Mine

Maleki, Hamid
Organization: International Conference on Ground Control in Mining
Pages: 9
Publication Date: Jan 1, 1994
The U.S. Bureau of Mines implemented a monitoring program in a western U.S. coal mine for the evaluation of both conventional and alternative support systems. The conventional support consisted of 2.5-m-long vertical bolts installed in an 5.5-m-wide entry. The alternative system consisted of 2.5- and 3-m vertical and inclined bolts installed at a higher density during widening of a cut from 3.6 to 5.5 m. Roof deformation, roof stress, rib deformation, and bolt loads were monitored during the 2-month test period. In addition, roof failure patterns and lithology were characterized within the six-entry main test section. Results were analyzed using roof deformation and failure profiles, roof stress profiles. bolt loading and bending moment diagrams, and numerical models. The mechanics of roof deformation, failure, and support reaction in three zones in the mine roof were characterized. Significant improvements were shown in roof stability in the section using the alternative system. Results are encouraging and indicate the effectiveness of alternative support systems and excavation techniques for limiting inelastic deformation of roof in highly stressed underground mines.
Full Article Download:
(2237 kb)


Additional chapters/articles from the SME-ICGCM book Proceedings of 13th International Conference on Ground Control in Mining

Cable Bolting - Potential Applications For Variable Strata C
Evaluation Of Support Performance In A Highly Stressed Mine
Operational Experience With FLEXIBOLT Systems In Australian
Roofbolting In The Cape Breton Development Corporation'
Some Factors Influencing Stability Of Longwall Gateroad
Design Of Roadway Support Using A Strain Softening Model
Automation Of A Progressive Failure Procedure For Analysis O
The Massive Collapse Of Coal Pillars - Case Histories From T
Time Dependent Strength Of Coal Strata For Long-Term Pillar
Yield Pillar Behavior At Jim Walter No. 7 Mine Stress And St
A Comparison Of Overburden Response Due To Longwall Mining
Longwall Ground Behavior Characteristics In The Illinois Coa
Cavability Study Of A Competent Roof - A Case Study
Roof Pressure Monitoring Using The Integrated Longwalt Autom
Longwall Production, Maintenance, And Roof Control System
The Design And Selection Of Powered Supports For Application
Tailgate Support Practice In U.S. Longwall Mines - A Survey
Influence Of Support Capacity And Geometry On Tailgate Suppo
Innovative Concept In Tailgate Entry Support: Elimination Of
Resin-Grouted Cables For Longwall Tailgate Support Stability
Tailgate Roadway Convergence: A Key Indicator Of Potential G
Assessment Of Wood And Alternative Materials For Supplementa
Experience With The Boundary Element Method Of Numerical Mod
The Fault At The End Of The Tunnel
Microseismic Monitoring In The Sydney Coalfield
Realistic Design Of Ground Control Based On Geotechnical Dat
Underground High Resolution Seismic Method As A Low Cost Alt
Pillarless Longwall Mining For Multiple Seams
Stable Entry Design In A Multi-Seam Environment
Evaluating Roof Control In Underground Coal Mines With The C
Hazard Mapping Combining Geostatistical Modeling Of Coal Min
Stereological Sampling And Analysis For Characterizing Disco
Determining Horizontal Stress Direction Using The Stress Map
Stability And Stress Evaluation In Mines Using In-Seam Seism
Hydrogeologic Effects Of Subsidence At A Longwall Mine In Th
Monitoring Railroad Response To Mining Subsidence And Assess
Study On The High-Pressure Grouting Of The Overburden For Su