If you have access to OneMine as part of a member benefit, log in through your member association website for a seamless user experience.
Developing a coal seam that has been influenced by previous mining in seams either above or below can result in severe ground control problems. In many instances, interactions between operations are inevitable. but improvements in ground stability can usually be achieved by-predicting potential problem areas in advance and adjusting the mining plans accordingly. This report investigates four case studies involving interactions between operations that used both room-and-pillar and longwall mining methods. In each case, geologic and mine design parameters are addressed, and those parameters found critical to the interaction are further defined in relation to observed ground problems. |