Analysis Of The Initial Collapse Of The Overburden Over Longwall Panels Using Subsidence Data

Marino, Gennaro G.
Organization: International Conference on Ground Control in Mining
Pages: 13
Publication Date: Jan 1, 1988
Documented case histories of surface ground movements from mine subsidence were utilized to help determine when the initial collapse of the overburden occurred above longwall panels. By studying this relationship between initial movement at the surface and the amount of face advance, the least-complex conditions exist for empirically assessing the span capacity of the overburden. The objective of this work was to obtain a better understanding of the overburden response to longwall mining. This knowledge will give a better insight on the long-term effects that different overburden types have on the stability and the subsidence potential of room and pillar mines, as well as, the influence of the overburden on subsidence over longwall panels. Theory on the overburden span capacity was developed and correlated to field observations. Data were used on the overburden lithology, depth, width, and face advance of the panel, and the subsidence conditions that were noted on the surface. The subsidence measured on the surface was used to determine when complete failure in the overburden rock had occurred. According to spans predicted by theory and the subsidence measured in the field, the competent lower units failed at a face advance less than when significant subsidence was observed on the surface. In each case studied, there were competent lower beds; however, the full overburden weight was not sustained to the point of subsidence. The best correlation with the surface movement was found with the most shallow, competent bed. Elastic plate solutions with various support conditions were found to best monitor the surface subsidence of these upper roof units.
Full Article Download:
(3200 kb)


Additional chapters/articles from the SME-ICGCM book Proceedings 7th International Conference on Ground Control in Mining (ICGCM) 7th

Field Evaluation of Yield Pillar System at a Kentucky longwa
In-Situ Pillar Strength Determination for Two-Entry Longwall
Integrity Factor Approach to Assess the Stability of Room-an
Longwall Recovery Utilizing The Open Entry Method And Variou
Design Of Lower Seam Longwall Operations In Multiple Seam Mi
Method Of Selecting Suitable Types Of Powered Supports At Lo
An Overview Of The National Roof Evaluation Accident Prevent
Strata Control Advances At Jim Walter Resources, Mining Divi
Portal Stability In Rock
Bailey Mine Slurry Impoundment Longwall Subsidence Monitorin
Prediction Of Surface Subsidence And Strain In The Appalachi
Computerised Subsidence And Displacement Prediction Using In
Computer Modeling Of Yield Pillar Behavior Using Post-Failur
Practical Rock Mechanics For Safety And Productivity Improve
Geotechnical Mine Design Of The Foidel Creek Mine
A Hydrogeomechanical Study Of Overburden Aquifer Response To
Comparison Of Predictions And Measurements Of Subsidence Cau
RYBAD Empirical Field Model For Prediction Of Maximum Land S
Mining Under Strong Roof
Sub-Surface Ground Movements Associated With Longwall Mining
A Computer Simulation Of Breakage Of The Main Roof In Longwa
Evaluation Of Low-Coal ATRS Systems
Analysis Of Major Failure Through Integration Of Static And
Outbursts And Rockbursts In Coal Mines
Analysis Of The Initial Collapse Of The Overburden Over Long
The Influence Of Stream Valleys On Coal Mine Ground Control
Aerostatic Support System For Underground Coal Mines
A Simplified Two-Dimensional Analysis Of The Roof-Pillar-Flo
Comparative Studies In The Mechanics Of Grouted Roof Bolts
Seismic Studies Over Active Longwall Mines
Surface Ground Movements Over Longwall Mining In The Pittsbu
Effect Of Longwall Mining Subsidence On The Stability Of Sur
Study Of Quantitative Impacts To Ground Water Associated Wit
The Broken Rock Zone Around Tunnels And Its Support Theory
Subsidence In Indian Coalfields
Case Studies Of Depillaring Under Special Strata And Mining
The Control Of Surface Subsidence By Width/Depth Ratio And C
Design Of The Ventilation Shaft In The South Link Railway Tu