Instrumentation and Monitoring For Pillar Extraction in a Deep, Faulted Uranium Mine

Scotese, Thomas R.
Organization: International Conference on Ground Control in Mining
Pages: 10
Publication Date: Jan 1, 1984
A rock mechanics instrumentation and monitoring program was implemented during pillar extraction at Gulf Mineral Resources' Mt. Taylor Mine, the deepest uranium mine in the U.S. Three types of monitoring were employed: (1) drift convergence around stopes (using a portable tube extensometer), (2) stress changes in pillars (using vibrating wire stressmeters in horizontal boreholes), and (3) load changes in haulage ways under stopes (using vibrating wire load cells in jack stands). Results include convergence-time graphs, convergence contour maps, stress-time graphs, a stress increase contour map, load-time graphs, and abutment load limit maps. Major factors influencing results include (1) size of pillars around the extraction area, and (2) presence and orientation of a major fault adjacent to one extraction area. These factors, combined with pillar extraction, produced evidence of load transfer over 120 m from a stope measuring only 55 m x 45 m. Vertical stress increases of 7 to 17 MPa (1000 to 2500 psi) within 60 m of the stope were obtained using the stress- meter manufacturer's method. The fault apparently prevented load transfer in the down-dip direction but increased load transfer in the up-dip direction. Convergence rates of up to 1.3 cm/day (0.5 in/day) were measured at two stations. Instruments were generally reliable despite adverse underground conditions. The instrumentation and monitoring program at Mt. Taylor provided a warning system against ground control problems and a characterization of ground behavior for future development and extraction of pillars. Recommendations are made for future mining and instrumentation practices.
Full Article Download:
(1942 kb)


Additional chapters/articles from the SME-ICGCM book Rock Mechanics in Productivity and Protection ? Proceedings Twenty five Symposium on Rock Mechanics

Mining-Induced Stress Measurement With Hydraulic Borerole Pr
Instrumentation and Monitoring For Pillar Extraction in a De
Reinforcement of Large Pillars by Bolting
Pressure Measurements in the Gob
Determination Of Solution Cavern Spacing In Deep Salt Deposi
Leached Salt Cavern Design Using a Fracture Criterion for Ro
Numerical Modeling Of "Stiff" Backfill in the Coeur D'A
Stress Control Method Applied to Stabilization of Undergroun
Optimun Mining Plan for Multiple Seam Mining
An Investigation of the Causes of Cutter Roof Failure in a C
Methods of Designing Mechanical Roof Bolting in Horizontally
Rock Bursts In Human Collieries
Constraint - The Missing Variable in the Coal Burst Problem
Prediction of Inter-Strata Movements Above Longwall Faces
Controlled Load Development At Longwall Coalfaces
Technique To Measure Resultant Load Vector On Shield Support
An Improved Technique of In-Situ Measurement Of Fracture Zo
Comprehensive Observation And Research On The Mechanism Of W
Displacement Discontinuity Method For Three-Dimensional Stre
Recent Developments In Subsidence Prediction And Control For
A Method For Assessing The Potential Of Mine Subsidence At A
Ground Movements Associated With Pillar Extraction Coal Mini
Application Of Time Domain Reflectometry To Mining
Proposed Criteria For Subsidence Damage To Buildings
Stability of Slopes in Discontinuously Jointed Rock
A Case History of the Effect of Mine Subsidence on a Concret
Microcomputer Simulation of Rock Blasting to Predict Fragmen
Probabilistic Analysis of Blasting Impact on Open Pit Stabil