Resupporting High Roof Falls

Chlumecky, Nicholas
Organization: International Conference on Ground Control in Mining
Pages: 16
Publication Date: Jan 1, 1981
One of the most dangerous jobs in mining is that of resupporting the roof after a fall has occurred. The resulting cavity may be more than 30 feet high, with relatively unstable sides and roof. It is often impossible to proceed with rehabilitation without exposing men and equipment to unsupported rock. Temporary supports provide margin- ally effective protection because of the lack of available footing. Furthermore, the usual supports in rehabilitated fall locations are not permanent, require frequent maintenance, and fail to eliminate some remaining serious safety hazards. This is typically the case for high cavities where loose rock drops from considerable heights from between roof bolts. Supports made of cribbing, beams and additional cribbing to the high points of the fall in many cases do not provide good protection due to the deterioration and shrinkage of timber. In mines, high cribbing frequently loses contact with the roof and thus provides no protection against rocks peeling off the sides. This is true in spite of the fact that at time of installation the cribbing was wedged tightly to the roof. Therefore, when considering the difficulties which occur with current practices, the objective is to find alternate methods of resupporting the high roof after a fall.
Full Article Download:
(9817 kb)


Additional chapters/articles from the SME-ICGCM book Proceedings Of The 1st Annual Conference On Ground Control In Mining

Stress And Stability In Coal Ribsides And Pillars
Improved Design Of Coal Pillars For U.S. Mining Conditions
Review Of Pillar Design Equations Including The Effects Of C
Abutment Pillar "Notching" Improves Abutment Tunnel Roof Con
The Influence Of Certain Geologic And Geotechnical Factors O
Considerations Of Gas Outbursts In Using Dome Salt Mines For
An Overview Of Bureau Of Mines Ground Control Research
Stability Behaviour Of Coal Mining Tunnels With Different Su
Strata Disturbance Prediction For Mining Beneath Surface Wat
Monitoring For The Evaluation Of The Stability Of Undergroun
Controlled Thrust And Torque Placement Of Mechanical Anchor
Roklok Polyurethane Binder: A Chemical Injection System For
Resupporting High Roof Falls
A New Combination Friction-Suspension Support System Scott
Inorganic Cement Grouted Bolt System
Development Of A Resin Point Anchor
An Engineering Analysis Of "Squeeze" Failure Of Pillars In T
Ground Control In Multiple Seam Mining
Applications Of Reflection Seismics To Mapping Coal Seam Str
The Use Of Geologic Modeling In The Prediction Of Adverse Ro
Design Of Shield Supports For The U.S. Coal Mining Industry
Longwall Mining Of Thin Seams
Support Selection For The Multi-Lift Mining Method
Design And Operation Of Powered And Entry Supports
Evaluation Of Existing Predictive Methods For Mine Subsidenc
A Study Of Longwall Subsidence In The Appalachian Coal Regio
Subsidence Studies In Thick And Steep Coal Seam Mining