Improving Empire?s Grinding Circuit Performance Using Six Sigma - Preprint 09-059

Walqui, H.
Organization: Society for Mining, Metallurgy & Exploration
Pages: 7
Publication Date: Jan 1, 2009
The Empire concentrator was built in four stages, with the latest stage accounting for 50% of the overall plant capacity. Over the past 5 years, the average throughput of the three grinding lines has decreased by 50 LTPH (15%) without significant changes in ore characteristics and despite the addition of secondary grinding capacity to supplement the existing pebble mills that are the constraint of the grinding circuit. This paper discusses the different areas under study that are aimed at optimizing grinding circuit utilization which includes improving system logic, pebble crushing operation and pebble mills operation.
Full Article Download:
(218 kb)