In-Service Monitoring Of Water Barrier Project At South Deep Gold Mine

Olivier, L. J.
Organization: The Southern African Institute of Mining and Metallurgy
Pages: 4
Publication Date: Jan 1, 2006
The possible closure and subsequent flooding of South Deep Gold Mine?s (SD) neighbouring Randfontein Estates Limited No. 4 Shaft (REL 4) necessitated the construction of five concrete plugs in the connecting tunnels to prevent the ingress of groundwater into REL4 from flooding SD. This paper describes the proposed controlled flooding of REL 4, the planned in-service monitoring of the five plugs and the water barrier between REL 4 and South Deep Mine, and the long-term maintenance of the plugs and rock mass in the immediate vicinity of the plugs.
Full Article Download:
(534 kb)