If you have access to OneMine as part of a member benefit, log in through your member association website for a seamless user experience.
The paper describes the construction of 5 plugs to resist high water heads at depth within the South Deep Gold Mine, Randfontein, South Africa. A total of 20 segments were involved to create these plugs, which were 7.5 m long at the 58 Level and 6.25 m long at the50 Level. Emphasis is placed on the QA/QC and verification methods, which were developed and governed all phases of the work, from initial rock preparation and pregrouting through to the final grout tightening of the rock/plug interface and the surrounding rock. This paper is one in a series of papers detailing other aspects of the project, which was constructed largely between May 2001 and August 2003. |