If you have access to OneMine as part of a member benefit, log in through your member association website for a seamless user experience.
Paper written on project work carried out in partial fulfilment of B. Eng (Mining Engineering) degree The purpose of this project was to identify constraints that could occur in the current sub-decline shaft at Turffontein Shaft should an increase in production take place. Particular attention was to be paid to the transportation of men and materials and to the broken rock and ventilation capacity of the shaft. This project is an in-depth evaluation of the logistic capacity of the sub-decline system at Turffontein Shaft in order to determine by how much production can be increased in this area to replace tonnages from the vertical shaft area, where ore reserves are rapidly becoming depleted. |