Winning Paper: Optimization Of A Raiseline At Mponeng Mine

Ragoonanthun, N.
Organization: The Southern African Institute of Mining and Metallurgy
Pages: 8
Publication Date: Jan 1, 2003
Paper written on project work carried out in partial fulfilment of B.Sc. (Mining Engineering) degree This report investigates the optimization of a raiseline in order to open up the ore reserve quicker. The project was carried out at Mponeng Mine (an Anglogold shaft formerly known as Western Deep Levels 1 Shaft and South Mine, in Carletonville). The project was divided into two focus areas namely: ?To design an optimum layout of a raiseline, which includes the scheduling of all activities for the establishment of the infrastructure. Consideration was given to the blasting practice, mining cycle, orepass placement and slusher positioning. Two designs were carried out on the above basis. ?The design of a ledging operation/practice to match the optimized layout of the raiseline. The ledging cycle design involved a thorough investigation into the possible use of drill rigs, Electronic Delay Detonators (EDD) blasting technology, longer drilled holes, Threshold Blasting (THROB),and water jet cleaning.
Full Article Download:
(956 kb)