Register  
Forgot Password?
Forgot User Name?
 

Document Summary

for "Excavation Of Inclined Shaft By Reaming In Two Stages"


Title
Excavation Of Inclined Shaft By Reaming In Two Stages
Author Hambach, P. 
Society / Organization SME 
Summary / Abstract Murer Company, Andermatt, Switzerland, can claim to have done pioneer work in the construction of inclined shafts. This happened in 1968/69, when we decided to bore with a Wirth tunnel borer an inclined shaft, 1100 m in length, 3.0 m in diameter, and with a grade of 65%, in the 2400 kilo pascall per sq. cm granite of the Montblanc Massive. The whole excavation was accomplished in ten months which, at least for European conditions, can be claimed as a record. It was, at least to our knowledge, the first inclined shaft to be bored full-face (Fig. 1). Encouraged by the experiences and performances attained at Châtelard, we approached other projects of the same kind. We were awarded, together with Hochtief Ltd., Essen, a contract from Schluchseewerke, Freiburg, Germany, in December 1969, for the construction of a penstock for the Hornbergstufe at Wehr, Germany, with a diameter of 6.3 m. This inclined shaft with a grade of 55% is located in Schwarzwalder granite with a compressive strength of up to 2000 kilo pascall per sq. cm, about 31,000 psi. As no exact geological data were available about the rock to be worked, and a fault zone from 80 to 150 m long had to be faced, as well as a few individual fissures of varying thickness, it was decided to use the multi-stage method. The 3-m diam tunnelling machine which had driven the oblique shaft at Châtelard had now finished work, and an immediate beginning was made with driving the pilot staft. This was very welcome to the contractor, since exact information about the type of rock present and the inflows of water was required immediately and before the final borehole diameter was fixed, for the purpose of dimensioning the supports to be subsequently installed. 
Format PDF 
File Size 943.0k 
Specifications v 7.0 / 300 dpi 
Copyright Date 1/1/74 
Publication Date 1/1/74 
Digitization Date 5/21/08 
Book Title Rapid Excavation And Tunneling Conference Proceedings - 1974 
Chapter Chapter 107 - Machines 
Pages 13 

There are 114 more documents from this Book.