|
Showing: 1 to 10 of 27 matches for "wagner scooptrams"
|
Page
1
2
3
|
|
|
|
|
|
| TITLE |
Silver Mining In Western Central Mexico |
| SUMMARY |
... However, Wagner Scooptrams (both 0.83 and 1.66 m3 capy) are used very successfully in some areas of the mine to transfer ore from stope draw holes to the ore ... |
| AUTHOR |
Haptonstall, Jack |
| PUBLISHED |
1983 |
|
 |
|
| TITLE |
Mining the Eastern Tennessee Ore Bodies |
| SUMMARY |
... Two Wagner Scooptrams are used for cleve!opment loading on declining drifts. Joy TL-55's are also used for stope level development. ... |
| PUBLISHED |
1976 |
|
 |
|
|
|
| TITLE |
Trackless Mining |
| SUMMARY |
... was driven in the hangingwall parall- el to the 18 sub-drives and con- nected by drawpoint crosscuts exca- vated to accommodate Wagner ST5B Scooptrams (Fig. ... |
| AUTHOR |
Mantell, K. E. |
|
 |
|
| TITLE |
Mount Macdonald Tunnel |
| SUMMARY |
... 1) 2) 3) 4) 5) Ground for one set (90 cm or 120 cm) was excavated with s Caterpillar 931B Backhoe. Muck was removed by Wagner ST-5 Scooptrams. ... |
| AUTHOR |
Steward, Allyn J. |
| PUBLISHED |
1987 |
|
 |
|
| TITLE |
Sublevel Stoping at Kidd Creek Mines |
| SUMMARY |
... MUCKING The production mucking units used at Kidd Creek No.1 Mine are Wagner ST-8 scooptrams powered by GMC V-8 diesel engines. ... |
| AUTHOR |
Belford, J. Eric |
| PUBLISHED |
1981 |
|
 |
|
| TITLE |
Decline Development At The Lakeshore Property |
| SUMMARY |
... load-haul-dumpunits. Most of the units that we have on the property at the present time are 8 cubic yard Wagner ST-8 scooptrams. ... |
| AUTHOR |
Hendricks, Robert S. |
| PUBLISHED |
1997 |
|
 |
|
| TITLE |
Waterproofing And The New Austrian Tunnel Method (NATM) |
| SUMMARY |
... WAGNER 8 CY and 5 CY scooptrams were used for muck handling from the face, dumping into WAGNER MTT 420 end dump trucks. A 2 CY unit ... |
| AUTHOR |
Laakso, Robert W., P. Eng. ; Beaton, A. Kevin, P. Eng. |
| PUBLISHED |
1991 |
|
 |
|
|
Showing: 1 to 10 of 27 matches for "wagner scooptrams"
|
Page
1
2
3
|
|