Register  
Forgot Password?
Forgot User Name?
 

Search Results

Search Results for "truck cycle time calculation"

  Search Again
Organization / Society
AIME (87)
AUSIMM (102)
CIM (1)
DFI (19)
EPA (1)
NIOSH (127)
RMCMI (14)
SAIMM (30)
SME (180)
TMS (2)



Showing: 1 to 10 of 563 matches for "truck cycle time calculation"  Page   1   2   3   4   5   6   7   8   9  next
TITLE Shovels, Trucks And Repair Bays. A Comprehensive Evaluation 
SUMMARY ... and few shovels available: low capacity per truck. ... The cycle time in each circuit
is calculated by alternating the waiting time calculation between the ...
AUTHOR Elbrond, Jorgen
PUBLISHED 1981
TITLE The determination of haulage-truck requirements for an open-pit operation 
SUMMARY ... requirement. Whereas the mining rate and truck factor in any calculation
are specified, the cycle time must be calculated. Therefore ...
AUTHOR Plaistowe, R. H. A. ; Algeo, M. B.
PUBLISHED 1979
TITLE Determining Shovel-Truck Productivity 
SUMMARY ... The shovel cycle has been simplified to consist of only two segments: (1)
time to load the truck and (2) transfer time between trucks. ...
AUTHOR Morgan, W. C. ; Peterson, L. L.
PUBLISHED 1968
TITLE Improvements in Truck and Shovel Scheduling Based on Capacity Constraint Modelling 
SUMMARY ... Differences in truck productivity were sensitive to components in cycle time
calculation; the differences became more pronounced with increased loading time ...
AUTHOR P C Hagan
PUBLISHED 2007
TITLE XPAC Destination Scheduling for Waste Dumps at BHP Billiton 
SUMMARY ... data: • total waste to each dump area, • average travel time to each dump area by
truck type, and • average fuel consumption/per cycle by truck type. ...
AUTHOR G J Butler
PUBLISHED 2007
TITLE Calculation Of An Open Pit Operation's Capacity 
SUMMARY ... is estab- lished from the work cycle pr dipper ... to the relation between dipper size
and truck size, the ... the standard deviation of this synthet- ic loading time. ...
AUTHOR Elbrond, Jorgen
PUBLISHED 1977
TITLE Some Aspects of quarring economics 
SUMMARY ... sizeand cycletime In outline the calculation follows these steps ... STEP1: The initial
selection of truck size is ... STEP2: Cycle time can be determined using maker's ...
AUTHOR Fiore, C. ; Coningsby, W. C. ; Kok, A.
PUBLISHED 1970
TITLE Technology News - Software Simulates Chemical, Physical Processes 
SUMMARY ... Increase haul return cycle time by 10 percent ... Note: SLD is spot, load and dump time. ...
Conclusion Simulation modeling validated the number of truck and shovel ...
PUBLISHED 2007
TITLE Software Tools for Open Pit Trucking Studies 
SUMMARY ... subject to a large number of variables and an accurate calculation of a ... ANALYSIS
OF RESULTS Analysis of the total cycle time and truck/shovel productivity ...
PUBLISHED 2010
TITLE A New Procedure For The Calculation Of An Open-Pit Operation's Capacity At The Carol Lake Operations Of The Iron Ore Company Of Canada - Introduction 
SUMMARY ... The average waiting times per truck at the shovel and at ... and periods of initial waiting
time after major ... The total average cycle time is then calculated, and ...
AUTHOR Elbrond, Jorgen
PUBLISHED 1979
Showing: 1 to 10 of 563 matches for "truck cycle time calculation"  Page   1   2   3   4   5   6   7   8   9  next

Search Again