Organization / Society
AIME (1980)
NIOSH (6)
SAIMM (85)
SME (1050)







Showing: 1 to 10 of 3100 matches for "face move"  Page   1   2   3   4   5   6   7   8   9  next
TITLE Minimizing Longwall Move Time By Using Microsoft Project 
SUMMARY ... The activities and necessary resources involved in a longwall face move are identified
and time to complete these activities are estimated as shown in Table 1. ...
AUTHOR Ercelebi, Selamet G. ; Yavuz, Mahmut
PUBLISHED 2002
TITLE Evaluation of floor heaving in galleries by numerical analysis 
SUMMARY ... observed. So, this total amount of deformation will prevent the transportation
of powered support units during the face move. The ...
AUTHOR Yavuz, M. ; Iphar, M. ; Aksoy, M. ; Once, G.
PUBLISHED 2003
TITLE Surface Subsidence, Overburden Behavior, And Structural Damages Due To Longwall Mining - Two Case Studies 
SUMMARY ... During normal face advancing operation, all surface points above the moving face
move toward the moving face, ie those points ahead of the moving face move ...
AUTHOR Peng, S. S. ; Geng, D. Y.
PUBLISHED 1984
TITLE Considerations in The Design of Longwall Mining Systems 
SUMMARY ... The impact of face moves and the potential for mining wider webs are assessed. ... C2 = $
700/ft = face conveyor costs per linear foot of face length ...
AUTHOR Barczak, Thomas M. ; Goode, Claude A.
PUBLISHED 1982
TITLE Series Fan Installation at Island Creek Coal Company 
SUMMARY ... REFERENCES the scheduled face move in April, 1989. Without Anon., 1981, "Duct Design,"
ASHRAE (American the air volume increases provided by the series ...
AUTHOR Ray, Richard Jr. ; Blankenship, Phil ; Johnston, David
PUBLISHED 1989
TITLE Multiple Seam Mine Design 
SUMMARY ... It should be noted that this is the super critical condition of mining subsidence
and that a dead ground zone exists above the longwall face. Move- ment here ...
AUTHOR Haycocks, C. ; Karmis, M. ; Ehgartner, B.
PUBLISHED 1982
TITLE Design Parameters Of Roof Support Systems For Pre-Driven Longwall Recovery Rooms 
SUMMARY ... Reduction in the recovery time required and improvements in safety during a longwall
face move have compelled coal mine operators to examine and use pre-driven ...
AUTHOR Tadolini, S. C. ; Barczak, T. M.
PUBLISHED 2004
TITLE Movement Of Longwalls At Shoemaker Mine 
SUMMARY ... The main phases of a move are: (1) Preparation of the new face; (2) Establishment
of ventilation con- trols and preparing the moving route; (3) Gathering the ...
AUTHOR Mack, Edward C. ; Stovash, Ronald G.
PUBLISHED 1981
TITLE Underground Caving Shield Change Outs At Us Steel’s Oak Grove Mine 
SUMMARY ... the caving shields. At no time during the move was the set up face waiting
on shields from the change out stations. In fact, this ...
AUTHOR Weyerman, B.
PUBLISHED 2001
TITLE Impact Of Water Sprays On Scrubber Ventilation Effectiveness 
SUMMARY ... scrubbers always operate in conjunction with symmetrical water sprays and these
sprays create the turbulent action necessary to move face contaminants from the ...
AUTHOR Volkwein, Jon C. ; Wellman, Travis S.
PUBLISHED 1989
Showing: 1 to 10 of 3100 matches for "face move"  Page   1   2   3   4   5   6   7   8   9  next