TITLE South Interceptor Tunnel Construction Using a Lovat EPBM 
SUMMARY ... Earth Pressure Balance (EPB) excavation was required to minimize the potential for
settlement beneath a main rail line, overpass, sensitive wetland, areas of ...
AUTHOR Breeds, Chris D. ; Molvik, Dennis ; Gonzales, Don ; Fulton, Omar
PUBLISHED 2003
TITLE Crosstown 5/6 Collector System Soft Ground Tunneling With An EPB Machine 
SUMMARY ... Valley in Milwaukee, Wisconsin, An earth pressure balance machine was ... compressed
air, an earth pressure balance tunneling machine, or shield jacked pipe. ...
AUTHOR Mixon, E. O. ; Rosteck, Jim. W, P. E. ; Sehulster, Joseph P.
PUBLISHED 1989
TITLE Pressure Balance Shield Pipe Jacking to Avoid Contamination 
SUMMARY ... An earth pressure balance (EPB) tunnel boring machine (TBM) and pipe jacking were
used to construct a 430-meter-long segment of sanitary sewer force main. ...
AUTHOR Boscardin, Marco D. ; Wooten, R. Lee ; Taylor, James M.
PUBLISHED 1997
TITLE EPB TBM Tunnelling in Singapore Old Alluvium 
SUMMARY ... services. Earth pressure balance (EPB) tunnel boring machines (TBM) have
been used extensively in Singapore with great success. The ...
AUTHOR Loganathan, N. ; O’Carroll, Joe ; Flanagan, Richard ; Tee, Tan Boon
PUBLISHED 2005
TITLE Application of Dot Tunneling Method to Construction of Multi¬service Utility Tunnel Adjacent to Important Structures 
SUMMARY ... 15.86 m wide, is the largest earth pressure balance shield machine in the world. ...
driven by the earth-pressure-balance shield method (hereafter called ...
AUTHOR Higashide, Akihiro ; Patten, Roy H.
PUBLISHED 1995
TITLE Cutting Through the Challenges of a Long Drive 
SUMMARY ... to its installation. 3.5 m (138 in) diameter Mechanical Earth-Pressure
Counter-Balance (MEPCB) tunnel machine. According to engineers ...
AUTHOR Coluccio, Frank ; Abbott, David G.
PUBLISHED 1995
TITLE Control of Ground Movements Due to Tunneling with an Earth Pressure Balance TBM 
SUMMARY ... CONTROL OF GROUND MOVEMENTS DUE TO TUNNELING WITH AN EARTH PRESSURE BALANCE TBM
Sakai Kunito Tokyu Construction Co., Ltd. ... Page 3. EARTH PRESSURE BALANCE TBM 131 ...
AUTHOR Kunito, Sakai ; Sugden, Nigel B.
PUBLISHED 2001
TITLE The New Generation of Soft Ground Tunnelling Machines 
SUMMARY ... 6. Future developments and conclusion EARTH-PRESSURE BALANCE SHIELDS The development
of earth-pressure balance shields started in the early Seventies in Japan. ...
AUTHOR Herrenknecht, Ing. E.h. Martin ; Burger, Werner
PUBLISHED 1999
TITLE Building the Underground River to Service Buenos Aires 
SUMMARY ... The process included the purchase by the client Aguas Argentinas of two sophisticated
4 metre diameter earth pressure balance tunnel boring machines from ...
AUTHOR Martin, Bernie W. ; Leray, Raymond ; Criado, Christian
PUBLISHED 1997
TITLE Handling of Heavily Alternating Water Inflow in the Shield Driven "Mangfallstollen" 
SUMMARY ... 4) Instead of a shield machine under compressed air, an earth pressure balance machine
with the appropriate fixtures for the various ground types was accepted. ...
AUTHOR Beyer, Michael
PUBLISHED 1995
Showing: 1 to 10 of 863 matches for "earth pressure balance"  Page   1   2   3   4   5   6   7   8   9  next

Search Again