The Development of Metallurgical Practice for Poseidon Limited Nickel Ores

Quadrio J S, ; MacHunter A M W,
Organization: The Australasian Institute of Mining and Metallurgy
Pages: 12
Publication Date: Jan 1, 1973
The initial development fl6tation testwork on Mt. Windarra op was completed on composited drill core intersections at the.Australian Mineral Development Laboratory. An exploratory winze provided samples, from the 130 M. level of the Mt. Windarra mine, for pilot plant and bench development tests. A limited test programme was initiated on the South Windarra drill core composites. Detailed mineralogy has been completed on selected samples from both ore deposits.
Full Article Download:
(281 kb)