Processing of Groote Eylandt Manganese Ores

Berglin C I K, ; Taylor R K A,
Organization: The Australasian Institute of Mining and Metallurgy
Pages: 14
Publication Date: Jan 1, 1973
The manganese ore deposits at Groote Eylandt are quite variable both in regard to grade and physical cond- ition. In order to treat a wider range of these ores and to increase production a new primary-crusher and' concentrator complex costing $8 million has been installed and commissioned to treat ore at the rate of 12,000 tonnes per day. The initial testwork carried out to determine the method of the ore treatment required, and on which the design of the concentrator was based, is detailed. The flowsheet and equipment used is discussed together with the operation of the plant. The production achieved and product qualities obtained are given.