Systhesis of Stochastic Recovery Prediction Cut-off Optimisation

Vassiliev P,
Organization: The Australasian Institute of Mining and Metallurgy
Pages: 4
Publication Date: Jan 1, 1998
Cut-off optimisation, based on the work of Lane (1988), can be used to maximise the NPV (Net Present Value) of a mine by the judicious manipulation of cut-offs and the use of stockpiles. Apart from maximising NPV, cut-off optimisation will ver
Full Article Download:
(281 kb)