Rise and Pillar Rill Stoping at Golden Crown Mine

Rogers M, ; Sullivan B,
Organization: The Australasian Institute of Mining and Metallurgy
Pages: 4
Publication Date: Jan 1, 1993
Golden Crown Mine is a narrow vein gold mine producing 75000 tpa. Production has been predominantly by shrink stoping using hand held machine and airleg. Bogging from these stopes is done with Toro 150 LHD units.Previously the standard development method consisted of developing a sill drive, a footwall drive and millholes every 7 m. This meant that for every metre of ore development, 2 m of waste development was required.
Full Article Download:
(281 kb)